2025 Municipal Election
The next general election for mayor, councillors, and the public and catholic school board trustees will be held on Monday, October 20, 2025.
The next general election for mayor, councillors, and the public and catholic school board trustees will be held on Monday, October 20, 2025.
This project involves road rehabilitation along with structural upgrades on Range Road 223 from Boysdale Road to Lamoureux Drive.
Road rehabilitation
Drainage improvements along Township Road 554.
Road rehabilitation
Collector reconstruction
A multi-phase project from Hwy 2 to Hwy 44.
Pedestrian bridge & pathway
Reconstruction and surfacing
This project involves reconstruction and resurfacing.
An initiative led by the City of Edmonton.
Using different treatments to preserve our roads.
The Sturgeon County Agriculture Master Plan (AMP) is a strategic roadmap to guide agriculture-related initiatives for the next 10-years.
The Sturgeon Valley is a wonderful and unique community with strong growth and development potential
Improving selected gravel roads in Sturgeon County.
Sturgeon County is committed to the effective management of County-owned lands to support agriculture, economy environment, and community wellbeing.
Road rehabilitation.
Phase 3 of the drainage improvements will be done in 2025.
Reconstruction and paving.
The pedestrian bridge in the Casa Vista subdivision is closed due to poor condition.
The Land Use Bylaw focuses on enabling growth, respecting landowner rights, protecting quality of life, streamlining processes and improving customer service.
The bridge culvert along Twp. Rd. 564 east of Hwy 28 will be replaced.
Reconstruction and repaving project.
The bridge culvert will be replaced.
Local roads
The gravel road is being reconstructed.
Removal of old bridge culvert and installing a new one
The project will replace the old bridge culvert structure.
A Sturgeon County contractor, Central Civil Solutions, will be working on rehabilitating the subdivision roads in Woodridge.
Lamoureux Drive will be rehabilitated from Lamoureux Drive from Highway 15 to Range Road 224A.
This project replaces a bridge culvert.
This project will improve drainage in the subdivision.
Bridge repairs
The proposed designation of Victoria Trail as a Municipal Historic Area would foster a sense of shared heritage and pride within our community
Drainage improvements with this project include vegetation removal, roadside ditching, and culvert replacements.
This project will address historical flooding concerns in the area.
Sturgeon County is working to improve our regional parks, open spaces, and trail network.
A Sturgeon County contractor will be rehabilitating the subdivision roads in Turfside Park.
Micro-surfacing projects.
Reconstruction and paving of Twp. Rd. 570.
Traffic calming measures to increase safety for residents.
Sturgeon County's project to build a process water intake facility.
This plan provides an overall vision for future development in the Villeneuve Airport area.
This development framework means new investors can confidently invest in the region and help the future take flight.
A contractor has been retained by Sturgeon County for pruning services on Green Ash boulevard trees in the Bristol Oaks community.
In 2024, Himalayan balsam, a weed designated as Prohibited Noxious under the Alberta Weed Control Act
This playground will provide a valuable recreational space for children and families, ensuring that our youngest residents have a safe and accessible place to play.
The Emerald Ash Borer (EAB) Trap Monitoring Program is a proactive surveillance initiative designed to detect and track the presence and spread of the Emerald Ash Borer.
The Sandy Lake Wilderness Area is a 167-hectare natural area in the west of Sturgeon County.
We are proposing changes to our resource extraction rules that consider industry input balanced with protecting residents’ interests.
The Villeneuve Airport Area Master Plan showcases the opportunities to capitalize on existing infrastructure in a way that complements the airport and Sturgeon County.
The Villeneuve Airport (ZVL) is a key regional economic asset. The land around the airport is primed to support billions in new investment and thousands of jobs.
Reconstruction and resurfacing.
Selected gravel rounds in the County.
Realignment of the road.
Reconstruction and surfacing.
Bridge rehabilitation on Cunningham Bridge.
Slope repair
Reconstruction and surfacing.
Bridge culvert replacement
The Agribusiness and Agritourism Review looked at how the County can best support and grow local agribusiness and agritourism.
Pavement preservation locations.
Remove existing arch culvert and replace with a new culvert.
Bridge culvert replacement.
Bridge culvert replacement.
Range Road 251 will be milled in 2023.
Reconstruction and paving of Rge. Rd. 220.
Reconstruction and surfacing.
Rehabilitation of Township Road 564.
Pavement preservation.
9613-100 Street
Morinville, Alberta
T8R 1L9