2025 Municipal Election
The next general election for mayor, councillors, and the public and catholic school board trustees will be held on Monday, October 20, 2025.
The next general election for mayor, councillors, and the public and catholic school board trustees will be held on Monday, October 20, 2025.
Sturgeon County’s tree maintenance program helps care for and preserve trees on County property.
Road rehabilitation
Local roads
The pedestrian bridge in the Casa Vista subdivision is closed due to poor condition.
Road rehabilitation
Collector reconstruction
This project will address historical flooding concerns in the area.
The bridge culvert will be replaced.
Drainage improvements along Township Road 554.
Reconstruction and surfacing
Pedestrian bridge & pathway
This project involves road rehabilitation along with structural upgrades on Range Road 223 from Boysdale Road to Lamoureux Drive.
This project involves reconstruction and resurfacing.
Lamoureux Drive will be rehabilitated from Lamoureux Drive from Highway 15 to Range Road 224A.
This playground will provide a valuable recreational space for children and families, ensuring that our youngest residents have a safe and accessible place to play.
The proposed designation of Victoria Trail as a Municipal Historic Area would foster a sense of shared heritage and pride within our community
The Sturgeon Valley is a wonderful and unique community with strong growth and development potential
Policing Priorities Survey
Sturgeon County and Villeneuve residents are exploring opportunities to enhance community amenities and shape the future of Villeneuve and its surrounding areas
We are proposing changes to our resource extraction rules that consider industry input balanced with protecting residents’ interests.
The Agribusiness and Agritourism Review looked at how the County can best support and grow local agribusiness and agritourism.
Sturgeon County is committed to the effective management of County-owned lands to support agriculture, economy environment, and community wellbeing.
Sturgeon County is working to improve our regional parks, open spaces, and trail network.
Updates to the Area Structure Plan
A wetland restoration project in Bellerose Park.
Planning is currently underway to create a new park space in Braun Village.
An engineering study looking at the feasibility and costs of adding water and sewer to Noroncal.
Improving selected gravel roads in Sturgeon County.
A Sturgeon County contractor, Central Civil Solutions, will be working on rehabilitating the subdivision roads in Woodridge.
In 2024, Himalayan balsam, a weed designated as Prohibited Noxious under the Alberta Weed Control Act
A Sturgeon County contractor will be rehabilitating the subdivision roads in Turfside Park.
A contractor has been retained by Sturgeon County for pruning services on Green Ash boulevard trees in the Bristol Oaks community.
The Emerald Ash Borer (EAB) Trap Monitoring Program is a proactive surveillance initiative designed to detect and track the presence and spread of the Emerald Ash Borer.
The Sandy Lake Wilderness Area is a 167-hectare natural area in the west of Sturgeon County.
Drainage improvements with this project include vegetation removal, roadside ditching, and culvert replacements.
The Villeneuve Airport (ZVL) is a key regional economic asset. The land around the airport is primed to support billions in new investment and thousands of jobs.
The Villeneuve Airport Area Master Plan showcases the opportunities to capitalize on existing infrastructure in a way that complements the airport and Sturgeon County.
This project replaces a bridge culvert.
The gravel road is being reconstructed.
A multi-phase project from Hwy 2 to Hwy 44.
Reconstruction and paving.
Road rehabilitation.
Reconstruction and repaving project.
The Land Use Bylaw focuses on enabling growth, respecting landowner rights, protecting quality of life, streamlining processes and improving customer service.
This project will improve drainage in the subdivision.
The Sturgeon County Agriculture Master Plan (AMP) is a strategic roadmap to guide agriculture-related initiatives for the next 10-years.
Using different treatments to preserve our roads.
Bridge culvert replacement.
Bridge rehabilitation on Cunningham Bridge.
Bridge culvert replacement.
Pavement preservation.
Reconstruction and paving of Rge. Rd. 220.
Slope repair
Bridge culvert replacement
Reconstruction and resurfacing.
Reconstruction and surfacing.
Reconstruction and surfacing.
Reconstruction and surfacing.
Remove existing arch culvert and replace with a new culvert.
The bridge culvert along Twp. Rd. 564 east of Hwy 28 will be replaced.
Micro-surfacing projects.
Reconstruction and paving of Twp. Rd. 570.
Traffic calming measures to increase safety for residents.
This plan provides an overall vision for future development in the Villeneuve Airport area.
This development framework means new investors can confidently invest in the region and help the future take flight.
Realignment of the road.
Phase 3 of the drainage improvements will be done in 2025.
An initiative led by the City of Edmonton.
Removal of old bridge culvert and installing a new one
The project will replace the old bridge culvert structure.
Bridge repairs
Sturgeon County's project to build a process water intake facility.
Selected gravel rounds in the County.
Range Road 251 will be milled in 2023.
9613-100 Street
Morinville, Alberta
T8R 1L9