The Project
The Project
The project will reconstruct and pave Township Road 570 between Hwy 44 and the CN line east of Alcomdale.
The Scope of Work
A total of 630 metres of roadway will be reconstructed and paved with asphalt. This includes:
- Full base reconstruction.
- Paving with hot mix asphalt.
- Culvert replacements including approaches and centreline culvert.
- Drainage improvements, including the regrading of ditches for the full length of the project.
What This Means to You
Heavy construction equipment will be in the area. Please drive safely through the area and watching for signage.
Project Updates
Project page created.