The Project
The existing 1500mm corrugated steel pipe culvert will be replaced with a new 40m, 2400mm corrugated steel pipe culvert. This project is expected to be finished before October 15, 2023. (Bridge file 00889)
The scope of work includes
- Land acquisition and various permitting agreements and approvals for a new bridge structure.
- Road excavation, removal, and disposal of the existing culvert.
- Assembly and installation of the new culvert.
- Rebuilding Twp. Rd. 564 within the project limits.
What this means to you
There is the possibility the road could be temporarily closed to traffic when the new culvert is installed. Area residents will be notified in advance.
Project Updates
Tender for this project opened on April 14, 2023 and ends on May 5, 2023.