The Project
The proposed 2023 reclamation limits for Rge. Rd. 251 are from Twp. Rd. 554 south to the Cardiff Park south entrance and the park’s roads.
Work involves
- hand patching,
- milling and removal of the top layer of asphalt, and
- grader patching work.
In 2024, the proposed reconstruction limits are from Twp. Rd. 554 south to the Cardiff Park entrance and the park’s roads. These roads will be reconstructed and paved.
Project Updates
Project page created.