The Project
The existing arch culvert will be replaced with a new structural plate corrugated steel pipe (SPCSP) which will be 34.14 m long. Construction is expected to be done before October 15, 2023. (Bridge file 08369)
The scope of work includes
- Various permitting agreements and approvals for the new bridge structure.
- Road excavation, removal and disposal of existing arch culvert.
- Assembly and installation of the new bridge culvert.
- Rebuilding Rge. Rd. 251 within the project limits.
What this means to you
Traffic could temporarily be reduced to one lane.
Project Updates
Construction tenders are currently being accepted for this project.