The Project

This project involves the reconstruction and surfacing of Gibbonslea subdivision north entrance to south of the CN railway tracks.

The Scope of Work

The project involves the full reconstruction of the road cross-section from the Gibbonslea Subdivision entrance to the CN Railway tracks, in accordance with the General Municipal Servicing Standards. The scope includes grading and re-establishing drainage ditches, replacing centreline and approach culverts, constructing the subgrade, granular base, and asphalt concrete pavement, as well as building residential and farm approaches. Additionally, existing traffic signs and related roadway appurtenances will be replaced to meet current standards.

What This Means to You

Residents can expect full reconstruction of the road between the Gibbonslea subdivision entrance and the CN Railway tracks, including improvements to drainage, culverts, pavement structure, and driveway approaches. These upgrades will enhance road safety, driving comfort, and drainage performance. Temporary traffic delays, detours, and limited access to properties may occur during construction, but one lane will remain open at all times. Please follow posted signs and exercise caution while traveling through the work zone.

Project Updates

The road excavation is in progress. Traffic accommodation is in place. One traffic lane is open at all times. Please drive with caution through the work zone and follow all posted signage.

Road excavation and subgrade construction are in progress, with one lane of traffic always remaining open. Traffic control measures are in place. Please drive carefully through the work zone and obey all posted signage.

Road excavation is underway, with one traffic lane open at all times. Traffic controls are in place, please drive with caution through the work zone and follow all posted signs.

Work on the project continues.

The construction is scheduled to start the week of July 20.

Construction is scheduled to start mid-July.

Construction is scheduled to start the second week of July.

Work is scheduled to start in mid-July 2025, once the power poles are relocated.

A construction timeline has not been finalized; however, underground and overhead utility relocations are currently underway.

A construction timeline has not been finalized; however, underground and overhead utility relocations are currently underway.

Work is underway to relocate both overhead and underground utilities.

Weekly updates on this project will be posted in this section.