The Project

Sturgeon County has partnered with the Edmonton Garrison to build a shared-use pathway connecting the north side of Twp. Rd. 542 (Valour Ave) adjacent to the Hwy 28 overpass bridge. A total of 625 metres of trail will be constructed and paved with asphalt.

The project is expected to be done by the end of June. Please remember that construction schedules are weather dependent and are subject to change.

The Scope of Work

  • Installing a 3 metre wide trail where portions are missing.
  • Connecting with the existing trail to Edmonton Garrison.

What This Means to You

Some portions of the trail could be closed during construction.

Project Updates

Project construction continues as scheduled.

Crews are beginning to move dirt to the area.

Project page created.