The Project

This program improves the condition of selected gravel roads within the County.

The Scope of Work

  • Grading, drying, and compaction of subgrade.
  • Full gravel lift.
  • Approach and road culvert replacements at selected locations.
  • Drainage improvements at selected locations.
  • Roadside brushing.

What This Means to You

  • Construction crews will be on site for about 7 to 14 days.
  • Roads will remain open to traffic during all phases of work with the exception of road culvert replacements. Motorists might experience delays during the project.
  • Advanced notice will be given to nearby residents and traffic signage will be in place.

Project Updates

The gravel road repairs on Range Road 213 north of Highway 644 and Range Road 213 north of Township Road 572 are underway. Geocells were added on these sections; they provide the stiffness and creep resistance needed to stabilize roads on soft soils.

Project page created.